Dynamic Navigator
Sdn. Bhd. · Kuala Lumpur
Request a study

ESG outcomes

The recovered energy is the smaller half of the value.

A building that can show instrumented, independently verifiable energy data is worth more than one that cannot — in certification, in financing spread, in tenant retention and in the assurance opinion its owner will soon need.

E

Environmental

  • 206 tCO₂e a year removed from the owner's Scope 2 inventory, and from every tenant's Scope 3.
  • Heat that would have gone to a cooling tower does useful work instead, cutting both rejection duty and makeup water.
  • Energy intensity falls, improving the building's position under EECA energy intensity labelling.
  • Hydraulic recovery arrives attached to greywater reuse — the water saving and the energy saving are delivered by the same capital project.
IFRS S2GHG Protocol S2GBI EEGreenREEECA 2024
S

Social

  • Lower common-area electricity holds service charges down — the single most contested line in any Malaysian JMB or management corporation budget.
  • Battery storage gives the tower ride-through for lifts, lighting and pumps during supply interruptions, which matters most on the upper floors.
  • Hot water at a lower operating cost for residents, with no change to delivered temperature or comfort.
  • Commissioning, monitoring and maintenance work is performed by local competent persons and creates skilled roles on site.
Bursa common indicatorsStrata Management Act 2013
G

Governance

  • Half-hourly, revenue-grade data against a declared IPMVP baseline — the difference between a disclosure that survives assurance and one that does not.
  • Recovery is metered at source, so the claim is traceable to an instrument rather than to a spreadsheet.
  • Emission factors, boundaries and assumptions are versioned and restatable, which is what auditors test first.
  • Qualifies the asset for GITA and GTFS documentation, and supplies the performance evidence that sustainability-linked facilities require at each observation date.
IFRS S1NSRFBursa CSIISAE 3410
Recovery points CLASS 0.5S METERS TURBINE · DRIVE · HX Edge gateway MODBUS TCP · BACNET 30-MIN INTERVAL HERS EMS IPMVP OPTION B DECLARED BASELINE VERSIONED FACTORS Savings register kWh · tCO₂e · RM RESTATABLE Disclosure IFRS S2 · BURSA EXTERNAL ASSURANCE RESTATEMENTS RETURN TO THE BASELINE, NOT TO A SPREADSHEET FROM INSTRUMENT TO AUDITED STATEMENT — ONE CHAIN, NO MANUAL RE-KEYING
Why the metering layer is the product. Most building energy claims break at the point where a number leaves an instrument and enters a spreadsheet. HERS is designed so that handover never happens.